Onshore wind · United Kingdom
Pogbie Wind Farm 2
Operator Mongoose (formerly Energy Law Unlimited& Pogbie Windfarm)
Operational4.8 MWData checked 16 November 2026Source record dated 2 December 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Pogbie Wind Farm 2 is a 4.8 MW wind farm 13 km east of Gorebridge, East Lothian, United Kingdom. Its planning application (15/00536/P) went to East Lothian on 3 August 2015 and was granted on 6 May 2016. It has been operating since 1 March 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Pogbie Wind Farm 2 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 4.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Mongoose (formerly Energy Law Unlimited& Pogbie Windfarm)
- Location
- Humbie, Lothian, East Lothian, EH36 5PN, United Kingdom
- Planning authority
- East Lothian
- Planning application
- 15/00536/P
- First operating
- 2019
- Turbines
- 6, 74 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/00536/P, with what the planning evidence pack adds for this site.
Every application in East Lothian · Alerts for applications and incidents near here
Timeline
- 3 August 2015 Planning application submitted
- 6 May 2016 Planning permission granted
- 1 June 2017 Construction started
- 1 March 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Pogbie Wind Farm 2. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Pogbie Wind Farm 2 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Pogbie Wind Farm 2; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Pogbie Wind Farm 2?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2019.
- Where is Pogbie Wind Farm 2?
- 13 km east of Gorebridge, East Lothian, United Kingdom (postcode EH36 5PN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).