Onshore wind · United Kingdom
Glen Kyllachy Wind Farm
Operator Greencoat UK Wind
Operational48.5 MWData checked 16 November 2026Source record dated 23 August 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Glen Kyllachy Wind Farm is a 48.5 MW wind farm 17 km south of Westhill, Highland, United Kingdom. Its planning application (13/02441/FUL) went to Highland on 28 June 2013 and was granted on appeal on 22 April 2015. It has been operating since 1 January 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Glen Kyllachy Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
28 settled days to 4 Nov: 1,600 MWh, running 41% of half hours, peak 23 MW of 49, load factor 5%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £23,947 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
GREENCOAT UK WIND PLC (08318092), active, since 2012. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 48.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Greencoat UK Wind
- Location
- 10 miles south of Inverness, 3 miles south-east of the B851 and 3 miles west of the A9 trunk road and village of Tomatin, Highland, United Kingdom
- Planning authority
- Highland
- Planning application
- 13/02441/FUL
- Appeal reference
- PPA-270-2115
- First operating
- 2022
- Turbines
- 20, 110 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/02441/FUL, with what the planning evidence pack adds for this site.
Every application in Highland · Alerts for applications and incidents near here
Timeline
- 28 June 2013 Planning application submitted
- 2 September 2014 Planning permission refused
- 21 November 2014 Appeal lodged
- 22 April 2015 Planning permission granted
- 22 April 2015 Appeal granted
- 1 January 2022 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Glen Kyllachy Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Glen Kyllachy Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Glen Kyllachy Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Glen Kyllachy Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2022.
- Where is Glen Kyllachy Wind Farm?
- 17 km south of Westhill, Highland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).