← Back to Stirling

Onshore wind · United Kingdom

Braes O'Doune

Operator Greencoat UK Wind

Operational72 MWData checked 16 November 2026Source record dated 5 January 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Braes O'Doune is a 72 MW wind farm 11 km north-west of Dunblane, Stirling, United Kingdom. Its planning application (S/02/01320/NST) went to Scottish Government (S36) on 31 October 2002 and was granted on 5 October 2004. It has been operating since 1 September 2006. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 5 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 15 other sites and 145 energy sites within 40 km for Braes O'Doune

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 5,379 MWh, running 80% of half hours, peak 35 MW of 72, load factor 11%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £27,593 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

GREENCOAT UK WIND PLC (08318092), active, since 2012. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
72 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Greencoat UK Wind
Location
Stirling, 2 km to the north of Braes of Doune, Stirling, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
S/02/01320/NST
First operating
2006
Turbines
36

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/02/01320/NST, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 31 October 2002 Planning application submitted
  • 5 October 2004 Planning permission granted
  • 1 May 2006 Construction started
  • 1 September 2006 Operational

None found. The register holds no published incident that names Braes O'Doune. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Braes O'Doune had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Braes O'Doune; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Braes O'Doune?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 January 2015.
Where is Braes O'Doune?
11 km north-west of Dunblane, Stirling, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).