Sixpenny Wood Windfarm

Operator Greencoat UK Wind

Operational33 MWData checked 16 November 2026Source record dated 5 January 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sixpenny Wood Windfarm is a 33 MW wind farm on the edge of Skelton, Humberside, United Kingdom. Its planning application (07/04680/STPLFE) went to East Riding of Yorkshire on 20 July 2007 and was granted on appeal on 8 December 2009. It has been operating since 15 July 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 15 other sites and 520 energy sites within 40 km for Sixpenny Wood Windfarm

Members see the sites and incidents around this one, and every record behind them.

GREENCOAT UK WIND PLC (08318092), active, since 2012. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
33 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Greencoat UK Wind
Location
Between Eastrington, Gilberdyke, Kilpin and Laxton, Humberside, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
07/04680/STPLFE
Appeal reference
09/00053/CALLIN
First operating
2013
Turbines
10

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 07/04680/STPLFE, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 20 July 2007 Planning application submitted
  • 30 October 2008 Planning permission refused
  • 8 December 2009 Planning permission granted
  • 8 December 2009 Appeal granted
  • 1 February 2012 Construction started
  • 15 July 2013 Operational

None found. The register holds no published incident that names Sixpenny Wood Windfarm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sixpenny Wood Windfarm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sixpenny Wood Windfarm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Sixpenny Wood Windfarm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 January 2015.
Where is Sixpenny Wood Windfarm?
On the edge of Skelton, Humberside, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).