Highland: energy planning applications
200 battery, solar and wind applications in the government planning database for Highland, 4.1 GW in all. 38 still in planning.
38In planning
51Granted or being built
48Operating
63Refused, withdrawn or closed
Battery storage 46 · Solar 19 · Onshore wind 135 · Battery storage across the UK · Solar across the UK · Wind across the UK
Alerts for applications near you
An email when an application near your postcode in Highland or beyond is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Every application in Highland, newest first
- Mybster Farm, Watten - Battery StorageBattery storage · 19.8 MW · Application Withdrawn · submitted 26 April 2026 · 26/01345/FUL
- Savalbeg WTW - Solar ArraySolar · 0.3 MW · Application Submitted · submitted 8 April 2026 · 26/01188/FUL
- Camisky Wellfield Water, Blackcairn House - Solar Array & BESSSolar · 2 MW · Application Submitted · submitted 27 March 2026 · 26/01165/FUL
- Longman Landfill, Stadium Road - Solar ArraySolar · 9.9 MW · Application Submitted · submitted 16 March 2026 · 26/00576/FUL
- Sallachy Estate - Wind Farm Additional TurbineOnshore wind · 4.8 MW · Application Submitted · submitted 11 March 2026 · 26/00589/FUL
- Buckies Farm - Battery Energy StorageBattery storage · 49.9 MW · Application Submitted · submitted 5 February 2026 · 25/02087/FUL
- Loch Calder Water Treatment Works, Quarry Brae - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 16 January 2026 · 26/00090/FUL
- Cnoc Farasd Wind FarmOnshore wind · 28.8 MW · Application Submitted · submitted 4 December 2025 · 25/04604/FUL
- Cnoc Farasd Wind FarmBattery storage · 15 MW · Application Submitted · submitted 4 December 2025 · 25/04604/FUL
- Scottish Water Challenger Estate - Ground Monted Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 7 November 2025 · 25/04028/CLP
- Quarry Brae - Solar PV PanelsSolar · 0.7 MW · Awaiting Construction · submitted 18 August 2025 · 25/02849/FUL
- Lochluichart East, Ardachy - Battery Energy Storage FacilityBattery storage · 36 MW · Application Submitted · submitted 12 August 2025 · 25/03004/FUL
- Loch Calder Water Treatment Work - Solar PanelsSolar · 0.7 MW · Awaiting Construction · submitted 8 August 2025 · 25/02122/CLP
- Oak Tree Cottage, Castletown - Wind TurbineOnshore wind · 4.3 MW · Application Submitted · submitted 31 July 2025 · 25/02477/FUL
- Achlachan Wind Farm 2, Watten - Wind FarmOnshore wind · 8.5 MW · Awaiting Construction · submitted 29 April 2025 · 25/01306/FUL
- Grigorhill Cottage, Grigorhill - Battery Energy StorageBattery storage · 49.9 MW · Awaiting Construction · submitted 10 February 2025 · 25/00154/FUL
- Hill Of Lynchrobbie, Dunbeath - Battery Storage FacilityBattery storage · 5 MW · Application Submitted · submitted 3 February 2025 · 25/00107/FUL
- Hill Of Lynchrobbie, Dunbeath - Wind TurbinesOnshore wind · 7.2 MW · Application Submitted · submitted 3 February 2025 · 25/00107/FUL
- Blackpark House - Battery StorageBattery storage · 30 MW · Awaiting Construction · submitted 16 December 2024 · 24/05019/FUL
- Castletown - Wind FarmOnshore wind · 9.6 MW · Application Submitted · submitted 12 December 2024 · 24/04932/FUL
- Castletown - Wind FarmBattery storage · 12 MW · Application Submitted · submitted 12 December 2024 · 24/04932/FUL
- Shore Street - Battery Energy StorageBattery storage · Awaiting Construction · submitted 11 December 2024 · 24/04909/FUL
- Lythmore House, Technology Park Forss - Battery Energy StorageBattery storage · 49.9 MW · Awaiting Construction · submitted 13 November 2024 · 24/04585/FUL
- Knockbain Farm - Wind turbineOnshore wind · Application Refused · submitted 3 October 2024 · 24/03379/FUL
- Geiselittle Farm - Battery Energy StorageBattery storage · 49.9 MW · Awaiting Construction · submitted 23 August 2024 · 24/03500/FUL
- Lochend Holding, Barrock - Wind FarmOnshore wind · 21 MW · Application Submitted · submitted 26 July 2024 · 24/02641/FUL
- Lochend Holding, Barrock - Wind FarmBattery storage · 10 MW · Application Submitted · submitted 26 July 2024 · 24/02641/FUL
- Spittal Mains Quarry - Battery storageBattery storage · 49.9 MW · Awaiting Construction · submitted 15 July 2024 · 24/02827/FUL
- Dounreay, Thurso - Battery Energy StorageBattery storage · 34 MW · Under Construction · submitted 20 May 2024 · 24/01669/FUL
- Balblair Quarry, Balblair - Battery Energy Storeage SystemBattery storage · 49.9 MW · Awaiting Construction · submitted 19 April 2024 · 24/01548/FUL
- Longman Pumping Station, Longman Drive - Photovoltaic PanelsSolar · 0.7 MW · Awaiting Construction · submitted 12 April 2024 · 24/01344/FUL
- Ben ScaOnshore wind · 40.8 MW · Application Submitted · submitted 11 April 2024 · 24/01404/FUL
- Glengolly Farmhouse- Battery Energy StorageBattery storage · 49.9 MW · Awaiting Construction · submitted 6 March 2024 · 24/00561/FUL
- Lochluichart - Energy Storage FacilityBattery storage · 49.9 MW · Awaiting Construction · submitted 2 February 2024 · 23/05905/FUL
- Beinn Mheadhonach Hill - Wind FarmOnshore wind · 21 MW · Application Submitted · submitted 23 January 2024 · 23/05638/FUL
- Somerby Farm, Lochussie - Wind turbineOnshore wind · 0.4 MW · Application Refused · submitted 13 January 2024 · 23/05917/FUL
- Raddery Smithy - Solar PV System InstallationSolar · 0.2 MW · Awaiting Construction · submitted 8 January 2024 · 23/05176/FUL
- The Smithy - Battery StorageBattery storage · 45 MW · Awaiting Construction · submitted 4 January 2024 · 23/05999/FUL
- Mybster Croft, Spittal - Battery Energy Storage FacilityBattery storage · Awaiting Construction · submitted 29 November 2023 · 23/05424/FUL
- Loch Toftingall, Halsary Wind Farm - Battery Energy StorageBattery storage · 49.9 MW · Awaiting Construction · submitted 28 September 2023 · 23/04690/FUL
- Raigmore Hospital, Old Perth Road - Battery StorageBattery storage · Awaiting Construction · submitted 27 September 2023 · 23/04285/CLP
- Raigmore Hospital, Old Perth Road - Solar CanopySolar · Awaiting Construction · submitted 27 September 2023 · 23/04285/CLP
- Tigh Na Bradhan, Fasnakyle - Battery Storage FacilityBattery storage · Application Refused · submitted 14 September 2023 · 23/02133/SP56
- An Cleireach, Balmeanach - Wind Farm & Battery StorageOnshore wind · 45 MW · Application Refused · submitted 31 August 2023 · 23/04194/FUL
- Caulternich Croft Energy Storage Project - Battery Storage FacilityBattery storage · 49.9 MW · Application Refused · submitted 29 June 2023 · 23/03113/FUL
- Drumore Cottage, Swordale - Battery StorageBattery storage · 49.9 MW · Awaiting Construction · submitted 20 June 2023 · 23/02840/FUL
- West Clyth Farm, Occumster - Wind TurbineOnshore wind · 0.2 MW · Awaiting Construction · submitted 30 May 2023 · 23/02632/FUL
- Feed Millakin - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 10 May 2023 · 23/02112/FUL
- Longman Pumping Station, Longman Drive - Photovoltaic PanelsSolar · 0.7 MW · Revised · submitted 11 April 2023 · 23/01791/FUL
- Fairways Business Park - Battery StorageBattery storage · 50 MW · Application Refused · submitted 17 February 2023 · 23/00497/FUL
- Harbro Limited, Harbour Road - Solar PV PanelsSolar · 0.4 MW · Application Submitted · submitted 19 January 2023 · 22/05154/FUL
- Shore Road - Distillery and Visitor CentreSolar · 1 MW · Awaiting Construction · submitted 18 January 2023 · 22/06107/FUL
- Cairnview, BettyhillBattery storage · Awaiting Construction · submitted 12 January 2023 · 23/00142/FUL
- Cairnview, BettyhillOnshore wind · 48 MW · Awaiting Construction · submitted 12 January 2023 · 23/00142/FUL
- Alness Grid Sub Station, Mid Balnacraig - Battery Storage FacilityBattery storage · 50 MW · Awaiting Construction · submitted 23 November 2022 · 22/05167/FUL
- Cairnmore Hill Wind FarmOnshore wind · 21 MW · Application Refused · submitted 23 September 2022 · 22/03558/FUL
- Househill House, Househill - Battery StorageBattery storage · 49.9 MW · Awaiting Construction · submitted 1 September 2022 · 22/03638/FUL
- Torr Leathann, Ardross - Battery StorageBattery storage · 5 MW · Application Refused · submitted 6 June 2022 · 22/02442/FUL
- Torr Leathann, Ardross - Wind FarmOnshore wind · 36 MW · Application Refused · submitted 6 June 2022 · 22/02442/FUL
- Stainland Energy Storage ProjectBattery storage · 49.9 MW · Awaiting Construction · submitted 23 May 2022 · 22/02054/FUL
- Tacher COnshore wind · 4.1 MW · Awaiting Construction · submitted 19 May 2022 · 22/02324/FUL
- Gorthleck - Wind turbineOnshore wind · 0.5 MW · Awaiting Construction · submitted 15 May 2022 · 22/02041/FUL
- Wick Airport Industrial Estate - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 29 March 2022 · 22/01234/FUL
- Boat of Garten - Battery Energy StorageBattery storage · 49.9 MW · Application Withdrawn · submitted 15 February 2022 · 22/00601/FUL
- Hillcrest Cottage, Shebster - Battery Energy Storage SystemBattery storage · 19.9 MW · Awaiting Construction · submitted 20 December 2021 · 21/05467/FUL
- Ben Sca 2 Wind TurbinesOnshore wind · 8.4 MW · Revised · submitted 10 December 2021 · 21/05767/FUL
- Platchaig House, Kilmorack - Battery Storage FacilityBattery storage · 49.9 MW · Revised · submitted 16 July 2021 · 21/03353/FUL
- Lochluichart Wind Farm Extension 2Onshore wind · 24 MW · Awaiting Construction · submitted 22 June 2021 · 21/02985/FUL
- Invershin Community Hall - Wind Farm & Battery StorageBattery storage · Awaiting Construction · submitted 15 April 2021 · ECU00003251
- Sallachy Estate - Wind FarmOnshore wind · 43.2 MW · Awaiting Construction · submitted 7 April 2021 · 21/01615/FUL
- Swordale Wind turbineOnshore wind · 0.6 MW · Application Refused · submitted 22 March 2021 · 21/01214/FUL
- Lairg 2 Wind FarmOnshore wind · 49.9 MW · Under Construction · submitted 23 February 2021 · 21/00849/FUL
- Kintradwell Lodge - Wind Farm & Battery storageBattery storage · Application Refused · submitted 19 February 2021 · 21/00826/S36
- Ackron Wind FarmOnshore wind · 49.9 MW · Revised · submitted 22 December 2020 · 20/05080/FUL
- Strath Tirry Wind FarmOnshore wind · 22.8 MW · Awaiting Construction · submitted 18 December 2020 · 20/05067/FUL
- Torrdhuin, Auchteraw Battery Storage FacilityBattery storage · 49.9 MW · Operational · submitted 18 November 2020 · 20/04565/FUL
- Forss Wind FarmOnshore wind · 4.5 MW · Application Submitted · submitted 11 November 2020 · 20/04455/FUL
- Cairnmore Hill Wind FarmOnshore wind · 33.6 MW · Revised · submitted 7 October 2020 · 20/03833/FUL
- Meall Buidhe Wind FarmOnshore wind · 40 MW · Awaiting Construction · submitted 21 August 2020 · 20/02659/FUL
- Lower Rumster wind turbineOnshore wind · 0.2 MW · Operational · submitted 27 July 2020 · 20/03178/FUL
- Blackpark Energy StorageBattery storage · 30 MW · Awaiting Construction · submitted 14 July 2020 · 20/02589/FUL
- Tacher BOnshore wind · 4.1 MW · Awaiting Construction · submitted 26 June 2020 · 20/02288/FUL
- Tacher AOnshore wind · 4.1 MW · Awaiting Construction · submitted 25 June 2020 · 20/02286/FUL
- Inverness Royal AcademySolar · 0.3 MW · Planning Permission Expired · submitted 6 March 2020 · 20/01072/FUL
- Strathrory Wind FarmBattery storage · Awaiting Construction · submitted 6 March 2020 · 20/00584/FUL
- Strathrory Wind FarmOnshore wind · 36 MW · Awaiting Construction · submitted 6 March 2020 · 20/00584/FUL
- Drum Hollistan Wind FarmOnshore wind · 35 MW · Application Refused · submitted 17 February 2020 · 20/00645/FUL
- Ben ScaOnshore wind · 29.4 MW · Revised · submitted 7 January 2020 · 20/00013/FUL
- Slickly Wind FarmOnshore wind · 49.9 MW · Awaiting Construction · submitted 6 January 2020 · 19/05624/FUL
- Slickly Wind FarmBattery storage · Awaiting Construction · submitted 6 January 2020 · 19/05624/FUL
- Land at TacherOnshore wind · 4.3 MW · Revised · submitted 12 December 2019 · 19/05479/FUL
- Auchteraw Energy StorageBattery storage · 20 MW · Application Withdrawn · submitted 6 December 2019 · 19/05385/FUL
- South Kilbraur Wind FarmOnshore wind · 28 MW · Application Refused · submitted 23 November 2019 · 19/04826/FUL
- Camster IIOnshore wind · 36 MW · Operational · submitted 7 August 2019 · 19/03015/FUL
- Lochaber High School (Resubmission)Solar · 0.3 MW · Operational · submitted 13 June 2019 · 19/02587/FUL
- Lochluichart Extension IIOnshore wind · 18 MW · Revised · submitted 11 April 2019 · 19/01284/FUL
- Lairg Wind Farm Extension (Lairg 2)Onshore wind · 34.5 MW · Revised · submitted 18 March 2019 · 19/01096/FUL
- Kerrow FarmBattery storage · 20 MW · Application Withdrawn · submitted 1 March 2019 · 19/00704/FUL
- Blackpark FarmBattery storage · 20 MW · Revised · submitted 28 February 2019 · 19/00702/FUL
- Alness AcademySolar · 0.5 MW · Under Construction · submitted 28 January 2019 · 18/05963/FUL
- Invergordon AcademySolar · 0.2 MW · Operational · submitted 11 January 2019 · 18/05962/FUL
- Beinn MheadhonachOnshore wind · 4 MW · Planning Permission Expired · submitted 10 July 2018 · 18/03214/FUL
- Hill of Lybster (Wind Turbine - Extension)Onshore wind · 1.5 MW · Operational · submitted 20 October 2017 · 17/04934/FUL
- NavidaleOnshore wind · 15 MW · Appeal Refused · submitted 22 May 2017 · 17/02436/FUL
- Hoy FarmOnshore wind · 2.3 MW · Application Refused · submitted 14 October 2016 · 16/04678/FUL
- Navidale EstateOnshore wind · 1 MW · Planning Permission Expired · submitted 6 May 2016 · 16/01959/FUL
- Lower ThuraOnshore wind · 4.6 MW · Application Refused · submitted 19 January 2016 · 16/00268/FUL
- Druim Ba WindfarmOnshore wind · 30 MW · Appeal Refused · submitted 23 October 2015 · 15/03998/FUL
- Tom Nan ClachOnshore wind · 39 MW · Operational · submitted 27 August 2015 · 15/03286/FUL
- Cogle Moss Wind FarmOnshore wind · 36 MW · Planning Permission Expired · submitted 11 August 2015 · 15/02769/FUL
- Land North-West Of Seater FarmOnshore wind · 2.7 MW · Application Refused · submitted 22 July 2015 · 15/02818/FUL
- Cnoc an Eas Wind FarmOnshore wind · 44.2 MW · Appeal Refused · submitted 15 July 2015 · 15/02758/FUL
- Lower Rumster wind turbineOnshore wind · 1 MW · Revised · submitted 24 June 2015 · 15/02386/FUL
- Achlachan Wind Farm - Phase 2Onshore wind · 6.9 MW · Abandoned · submitted 21 May 2015 · 15/01831/FUL
- Tresdale Farm wind clusterOnshore wind · 6.9 MW · Application Refused · submitted 14 May 2015 · 15/01261/FUL
- Achlachan 2 WindfarmOnshore wind · 7.5 MW · Revised · submitted 11 May 2015 · 15/01831/FUL
- Aberarder Wind FarmOnshore wind · 49.9 MW · Under Construction · submitted 3 March 2015 · 15/00737/FUL
- Carr Ban Wind FarmOnshore wind · 23.8 MW · Application Withdrawn · submitted 19 January 2015 · 14/04805/FUL
- Culachy Wind FarmOnshore wind · 44 MW · Revised · submitted 15 January 2015 · 14/04782/FUL
- Hill of NiggOnshore wind · 7.5 MW · Application Refused · submitted 13 January 2015 · 15/00093/FUL
- Cnoc MorailOnshore wind · 11.5 MW · Application Refused · submitted 21 November 2014 · 14/04375/FUL
- TomfatOnshore wind · 1.6 MW · Application Refused · submitted 10 November 2014 · 14/04452/FUL
- Buckies Hill Wind FarmOnshore wind · 4.5 MW · Application Refused · submitted 6 November 2014 · 14/03913/FUL
- Glen Ullinish Wind FarmOnshore wind · 49.9 MW · Awaiting Construction · submitted 28 October 2014 · 14/03964/FUL
- Dell Wind FarmOnshore wind · 50 MW · Revised · submitted 29 July 2014 · 14/02879/FUL
- Croick EstateOnshore wind · 4.6 MW · Application Withdrawn · submitted 16 May 2014 · 14/01752/FUL
- Beinn MhorOnshore wind · 21 MW · Appeal Refused · submitted 1 May 2014 · 14/01731/FUL
- Carn Gorm Wind FarmOnshore wind · 42 MW · Appeal Refused · submitted 20 December 2013 · 13/04791/FUL
- Woodlands Wind FarmOnshore wind · 15 MW · Application Withdrawn · submitted 16 December 2013 · 13/04703/FUL
- Spittal HillOnshore wind · 21 MW · Appeal Refused · submitted 3 December 2013 · 13/04559/FUL
- Hill Of LychrobbieOnshore wind · 2.4 MW · Planning Permission Expired · submitted 7 November 2013 · 13/04194/FUL
- Stroupster Wind Farm - additional turbineOnshore wind · 2.3 MW · Operational · submitted 5 November 2013 · 13/04144/FUL
- Upper Smerral Wind ClusterOnshore wind · 2.7 MW · Application Refused · submitted 19 September 2013 · 13/03555/FUL
- Balnacoil Wind FarmOnshore wind · 45 MW · Application Refused · submitted 4 September 2013 · 13/03312/FUL
- Lochend Wind FarmOnshore wind · 9.2 MW · Operational · submitted 29 July 2013 · 13/02682/FUL
- Tressady Wind FarmOnshore wind · 32.5 MW · Appeal Refused · submitted 22 July 2013 · 13/02749/FUL
- Glen Kyllachy Wind FarmOnshore wind · 48.5 MW · Operational · submitted 28 June 2013 · 13/02441/FUL
- Lyth Wind FarmOnshore wind · 24 MW · Appeal Refused · submitted 18 May 2013 · 13/01832/FUL
- Achlachan Wind FarmOnshore wind · 10 MW · Operational · submitted 11 April 2013 · 13/01190/FUL
- Lower Rumster wind turbineOnshore wind · 1 MW · Revised · submitted 2 April 2013 · 13/01201/FUL
- Bad a Cheo Wind FarmOnshore wind · 26.7 MW · Operational · submitted 25 July 2012 · 12/02868/FUL
- Cromarty Wind FarmOnshore wind · 2.4 MW · Application Refused · submitted 22 May 2012 · 12/01650/FUL
- Clach Liath Wind FarmOnshore wind · 42.5 MW · Application Refused · submitted 30 April 2012 · 12/01689/FUL
- Coire Na Cloiche Wind FarmOnshore wind · 29.9 MW · Operational · submitted 16 February 2012 · 12/00479/FUL
- Daviot Wind FarmOnshore wind · 32.5 MW · Appeal Refused · submitted 5 January 2012 · 12/00036/FUL
- Rumster Forest Community Wind FarmOnshore wind · 2.7 MW · Abandoned · submitted 21 December 2011 · 11/04522/FUL
- Wathegar 2 Wind FarmOnshore wind · 18.5 MW · Operational · submitted 10 October 2011 · 11/03671/FUL
- Moy Wind FarmOnshore wind · 40 MW · Abandoned · submitted 5 April 2011 · 11/01205/FUL
- Forss Extension (Forss III)Onshore wind · 6.5 MW · Appeal Refused · submitted 28 October 2010 · 10/04434/FUL
- CorriemoillieOnshore wind · 54.4 MW · Operational · submitted 5 October 2010 · 10/04137/FUL
- Upper Smerral Wind ClusterOnshore wind · 3.2 MW · Revised · submitted 27 August 2010 · 10/03501/FUL
- Glenurquhart and Strathglass Wind Farm projectOnshore wind · 10 MW · Operational · submitted 12 May 2010 · 10/02132/FUL
- Wathegar wind farmOnshore wind · 10 MW · Operational · submitted 9 February 2010 · 10/00042/FULCA
- Corriemoillie ForestOnshore wind · 47.5 MW · Revised · submitted 2 December 2009 · 09/00693/FULRC
- Halsary Wind FarmOnshore wind · 34 MW · Operational · submitted 9 November 2009 · 09/00399/FULCA
- TomatinOnshore wind · 25.5 MW · Application Refused · submitted 24 June 2009 · 09/00439/FUL
- StrathboraOnshore wind · 46 MW · Application Withdrawn · submitted 12 June 2009 · SU2003332
- Tom Nan Clach Wind FarmOnshore wind · 39.1 MW · Revised · submitted 1 June 2009 · 09/00439/FULIN
- Ben Aketil ExtensionOnshore wind · 4.6 MW · Operational · submitted 16 April 2009 · 09/00115/FULSL
- Druim FadaOnshore wind · 10 MW · Planning Permission Expired · submitted 1 February 2009 · 09/00074/FULLO
- Durran MainsOnshore wind · 19.5 MW · Application Refused · submitted 26 August 2008 · 08/00386/FULCA
- Nigg HillOnshore wind · 10 MW · Application Refused · submitted 24 January 2008 · 08/00066/FULRC
- Phase 1 Bettyhill Wind FarmOnshore wind · 5 MW · Operational · submitted 9 November 2007 · 07/00448/FULSU
- CorriegarthOnshore wind · 69.5 MW · Operational · submitted 15 July 2007 · 07/00673/FULIN
- Millennium ExtensionOnshore wind · 10 MW · Operational · submitted 10 March 2007
- Burn of WhilkOnshore wind · 22.5 MW · Operational · submitted 23 February 2007 · 06/00676/FULCA.
- Beinn Tharsuinn Extension (Beinn nan Oighrean)Onshore wind · 4.6 MW · Operational · submitted 19 January 2007 · 07/00026/FULSU
- Lairg Wind FarmOnshore wind · 7.5 MW · Operational · submitted 5 September 2006 · 06/00376/FULSU
- MelnessOnshore wind · 2.6 MW · Abandoned · submitted 12 July 2006 · 06/00271/FULSU
- Broombank FarmOnshore wind · 2 MW · Application Refused · submitted 1 July 2006 · 06/00124/FUL
- South ShebsterOnshore wind · 10 MW · Application Refused · submitted 19 December 2005
- Rosehall Hill Forest WindfarmOnshore wind · 24.7 MW · Operational · submitted 30 November 2005 · 05/00429/FULSU
- Achany Wind FarmOnshore wind · 38 MW · Operational · submitted 28 October 2005
- Hill of Stroupster WindfarmOnshore wind · 29.9 MW · Operational · submitted 7 June 2005 · 05/00273/FULCA
- FairburnOnshore wind · 43 MW · Operational · submitted 10 May 2005 · 05/00436/FULRC
- Forss Wind Farm (Extension)Onshore wind · 5.2 MW · Operational · submitted 5 January 2005 · 01/00380/FULCA
- AchairnOnshore wind · 6.2 MW · Operational · submitted 11 August 2004 · CA2004366
- Bilbster Wind FarmOnshore wind · 3.9 MW · Operational · submitted 23 January 2004 · CA200417
- Millennium WindfarmOnshore wind · 40 MW · Operational · submitted 1 December 2003 · 03/00505/FULL
- Kilbraur WindfarmOnshore wind · 47.5 MW · Operational · submitted 4 September 2003 · SU2004125
- Hill of LieuraryOnshore wind · 8 MW · Application Refused · submitted 10 July 2003 · CA2003323
- Novar Wind Farm (Extension)Onshore wind · 36.8 MW · Operational · submitted 14 May 2003 · 03/00426/FULRC
- Ben AketilOnshore wind · 23 MW · Operational · submitted 30 August 2002 · SL2002275
- Dounreay WindfarmOnshore wind · 17.5 MW · Appeal Refused · submitted 25 April 2002 · 02/00166/FULCA
- Beinn Tharsuinn Windfarm ProjectOnshore wind · 29.8 MW · Operational · submitted 19 April 2002 · RC2003784 & SU2003318
- Edinbane Wind FarmOnshore wind · 41.4 MW · Operational · submitted 28 February 2002 · 02/00089/FULSL
- CauseymireOnshore wind · 48.3 MW · Operational · submitted 1 November 2001 · 01/00361/FULCA
- BoulfruichOnshore wind · 13 MW · Operational · submitted 17 September 2001 · CA2001306
- Forss Wind FarmOnshore wind · 2.6 MW · Operational · submitted 12 January 2001 · 01/00030/FULCA
- Hill of LybsterOnshore wind · 4.9 MW · Operational · submitted 28 April 2000 · CA2001030
- Gartymore Wind FarmOnshore wind · 10.5 MW · Application Refused · submitted 19 October 1995
- West Garty Wind FarmOnshore wind · 12 MW · Revised · submitted 9 October 1995
- Bendealt Wind Farm, HighlandOnshore wind · 9 MW · Operational · submitted 17 May 1995
- Meall an Tuirc Wind FarmOnshore wind · 17 MW · Operational · submitted 17 May 1995
- CambusmoreOnshore wind · 49.5 MW · Application Withdrawn · SU2003383
- Hill of StroupsterOnshore wind · 36 MW · Application Withdrawn · 07/00244/FUL
- Horse Island Microgrid ProjectBattery storage · Operational
- Isle of Eigg Electrification ProjectBattery storage · 0.1 MW · Operational
- Isle of Muck Microgrid SystemBattery storage · Operational
- Isle of Rum Microgrid ProjectBattery storage · Operational
Refused, withdrawn or taken to appeal
Incidents on the register near Highland's applications
2 incidents within 50 km of an application here, nearest first. Counts of incidents in published reporting, not rates.
For a planning case
The planning evidence pack sets out, for one application in Highland, every comparable incident nearest first with its sources, the schemes refused, withdrawn or taken to appeal nearby, and the fire service guidance each incident bears on. Launch price: £145 until 31 October (normally £295). Download a sample pack (PDF).
Neighbouring planning authorities
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Every planning authority.