← Back to Highland
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Kyllachy Wind Farm - BESS

Operator Wind Estate (UK) Limited

Application Submitted22 MWData checked 16 November 2026Source record dated 13 October 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Kyllachy Wind Farm - BESS is a 22 MW battery storage site 15 km south of Westhill, Highland, United Kingdom. Its planning application (ECU00005153) went to Scottish Government (S36) on 5 September 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 15 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kyllachy Wind Farm - BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 446 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool446 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells507 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire642 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
22 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Wind Estate (UK) Limited
Location
Kyllachy Wind Farm, Approximately 4km SW/O Tomatin & N/O Kyllachy Estate, Tomatin, Highland, IV13 7ZA, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00005153

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00005153, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 5 September 2025 Planning application submitted

None found. The register holds no published incident that names Kyllachy Wind Farm - BESS. If you know of one, report it (confidential reports are anonymised).

Has Kyllachy Wind Farm - BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kyllachy Wind Farm - BESS; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kyllachy Wind Farm - BESS?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 13 October 2025.
Where is Kyllachy Wind Farm - BESS?
15 km south of Westhill, Highland, United Kingdom (postcode IV13 7ZA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).