Onshore wind · United Kingdom

Farr Wind Farm

Operator Innogy (formerly RWE npower)

Operational92 MWData checked 16 November 2026Source record dated 17 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Farr Wind Farm is a 92 MW wind farm 16 km south of Westhill, Highland, United Kingdom. Its planning application went to Scottish Government (S36) on 12 September 2002 and was granted on 5 October 2004. It has been operating since 1 October 2005. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 95 energy sites within 40 km for Farr Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 5,908 MWh, running 57% of half hours, peak 39 MW of 92, load factor 9%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £49,437 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
92 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Innogy (formerly RWE npower)
Location
TomatinInverness, Highland, United Kingdom
Planning authority
Scottish Government (S36)
First operating
2005
Turbines
40

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 12 September 2002 Planning application submitted
  • 5 October 2004 Planning permission granted
  • 1 April 2005 Construction started
  • 1 October 2005 Operational

None found. The register holds no published incident that names Farr Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Farr Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Farr Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Farr Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 September 2020.
Where is Farr Wind Farm?
16 km south of Westhill, Highland, United Kingdom.