Onshore wind · United Kingdom
Causeymire
Operator Innogy (formerly RWE npower)
Operational48.3 MWData checked 16 November 2026Source record dated 18 May 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Causeymire is a 48.3 MW wind farm in Wick, Highland, United Kingdom. Its planning application (01/00361/FULCA) went to Highland on 1 November 2001 and was granted on 19 November 2002. It has been operating since 1 June 2004. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 5 of them wind farms. The register holds one incident at this site, the latest in 2009.
Incidents on the register at this site
A technician employed by Siemens died at the Causeymire wind farm in Scotland on 16 September 2009 during a warranty inspection of turbine 18. Four people were in the nacelle, two from Siemens and two from RWE. While an RWE engineer was pitching the rotor...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Causeymire changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 48.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Innogy (formerly RWE npower)
- Location
- Causey Mire, Caithness, Highlands, Highland, United Kingdom
- Planning authority
- Highland
- Planning application
- 01/00361/FULCA
- First operating
- 2004
- Turbines
- 24
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 01/00361/FULCA, with what the planning evidence pack adds for this site.
Every application in Highland · Alerts for applications and incidents near here
Timeline
- 1 November 2001 Planning application submitted
- 19 November 2002 Planning permission granted
- 1 June 2004 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Causeymire had a fire or other incident?
- Yes. The register holds one incident that names it: Fatal gearbox shaft entanglement at Causeymire wind farm in Scotland (EIR-2488, 2009).
- What is the status of Causeymire?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 May 2017.
- Where is Causeymire?
- In Wick, Highland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).