Solar · United Kingdom
Wick Airport Industrial Estate - Solar Panels
Operator Nuclear Decommissioning Authority
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 11 April 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wick Airport Industrial Estate - Solar Panels is a 0.3 MW solar farm in Wick, Highland, United Kingdom. Its planning application (22/01234/FUL) went to Highland on 29 March 2022 and was granted on 22 June 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 10 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Wick Airport Industrial Estate - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wick Airport Industrial Estate - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 218 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 218 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 266 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 337 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Nuclear Decommissioning Authority
- Location
- Nucleus The Nuclear And Caithness Archives Wick Airport Industrial Estate Wick, Highland, KW1 4QS, United Kingdom
- Planning authority
- Highland
- Planning application
- 22/01234/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/01234/FUL, with what the planning evidence pack adds for this site.
Every application in Highland · Alerts for applications and incidents near here
Timeline
- 29 March 2022 Planning application submitted
- 22 June 2022 Planning permission granted
- 22 June 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Wick Airport Industrial Estate - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Wick Airport Industrial Estate - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wick Airport Industrial Estate - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Wick Airport Industrial Estate - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 April 2022.
- Where is Wick Airport Industrial Estate - Solar Panels?
- In Wick, Highland, United Kingdom (postcode KW1 4QS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).