Court Farm

Operator BE Renewables

Operational8.5 MWData checked 16 November 2026Source record dated 4 October 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Court Farm is a 8.5 MW solar farm 4.1 km north-west of Magor, Gwent, United Kingdom. Its planning application (14/1275) went to Newport on 5 March 2015 and was granted on appeal on 9 October 2015. It has been operating since 30 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 44 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 6 other sites and 531 energy sites within 40 km for Court Farm

Members see the sites and incidents around this one, and every record behind them.

BE RENEWABLES LTD (08307603), dissolved, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
8.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
BE Renewables
Location
Land Forming Part Of Court Farm, Magor Road, Gwent, NP18 2EB, United Kingdom
Planning authority
Newport
Planning application
14/1275
Appeal reference
APP/G6935/A/15/3034087
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/1275, with what the planning evidence pack adds for this site.

Every application in Newport · Alerts for applications and incidents near here

  • 5 March 2015 Planning application submitted
  • 7 April 2015 Planning permission refused
  • 10 July 2015 Appeal lodged
  • 9 October 2015 Planning permission granted
  • 9 October 2015 Appeal granted
  • 30 January 2017 Construction started
  • 30 March 2017 Operational

None found. The register holds no published incident that names Court Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Court Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Court Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Court Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 October 2017.
Where is Court Farm?
4.1 km north-west of Magor, Gwent, United Kingdom (postcode NP18 2EB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).