Onshore wind · United Kingdom
Longlands Farm, Rush Wall Lane
Operator Clean Earth (CE)
Operational3.5 MWData checked 16 November 2026Source record dated 15 February 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Longlands Farm, Rush Wall Lane is a 3.5 MW wind farm on the edge of Magor, Gwent, United Kingdom. Its planning application (18/0408) went to Newport on 3 May 2018. It has been operating since 1 January 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Longlands Farm, Rush Wall Lane changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 3.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Clean Earth (CE)
- Location
- Land Adjacent To And South Of, Rush Wall Lane, Magor, Caldicot, Gwent, Gwent, NP26 3DX, United Kingdom
- Planning authority
- Newport
- Planning application
- 18/0408
- First operating
- 2021
- Turbines
- 1, 150 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 18/0408, with what the planning evidence pack adds for this site.
Every application in Newport · Alerts for applications and incidents near here
Timeline
- 3 May 2018 Planning application submitted
- 1 October 2020 Construction started
- 1 January 2021 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Longlands Farm, Rush Wall Lane. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Longlands Farm, Rush Wall Lane had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Longlands Farm, Rush Wall Lane; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Longlands Farm, Rush Wall Lane?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2024.
- Where is Longlands Farm, Rush Wall Lane?
- On the edge of Magor, Gwent, United Kingdom (postcode NP26 3DX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).