Onshore wind · United Kingdom

Tesco Distribution Steelworks, Access Road - Wind Turbine

Operator Clean Earth Energy

Revised3.6 MWData checked 16 November 2026Source record dated 17 August 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tesco Distribution Steelworks, Access Road - Wind Turbine is a 3.6 MW wind farm on the edge of Magor, Gwent, United Kingdom. Its planning application (DM/2023/00549) went to Monmouthshire on 7 April 2023 and was withdrawn on 5 May 2023. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 38 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

CLEAN EARTH ENERGY LIMITED (07225190), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tesco Distribution Steelworks, Access Road - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 43 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch43 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition101 kmMajor
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales101 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
3.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Clean Earth Energy
Location
Se/O Tesco Distribution Steelworks, Access Road, A4810 Magor Monmouthshire, Caldicot, Gwent, NP26 3DX, United Kingdom
Planning authority
Monmouthshire
Planning application
DM/2023/00549
Turbines
1, 150 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/2023/00549, with what the planning evidence pack adds for this site.

Every application in Monmouthshire · Alerts for applications and incidents near here

  • 7 April 2023 Planning application submitted
  • 5 May 2023 Application withdrawn

None found. The register holds no published incident that names Tesco Distribution Steelworks, Access Road - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Tesco Distribution Steelworks, Access Road - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tesco Distribution Steelworks, Access Road - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Tesco Distribution Steelworks, Access Road - Wind Turbine?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 17 August 2023.
Where is Tesco Distribution Steelworks, Access Road - Wind Turbine?
On the edge of Magor, Gwent, United Kingdom (postcode NP26 3DX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).