← Back to Clwyd

Onshore wind · United Kingdom

Bodtegir

Operator Clean Earth Energy

Operational1.5 MWData checked 16 November 2026Source record dated 15 January 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bodtegir is a 1.5 MW wind farm 16 km south-west of Ruthin, Clwyd, United Kingdom. Its planning application (0/42466) went to Conwy on 12 February 2016 and was granted on 20 April 2016. It has been operating since 1 November 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 10 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 5 other sites and 127 energy sites within 40 km for Bodtegir

Members see the sites and incidents around this one, and every record behind them.

CLEAN EARTH ENERGY LIMITED (07225190), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Clean Earth Energy
Location
Land at Bodtegir, part of the, Mwdwl Eithin, Nant Bach Wind Farm On Land At, Corwen, Clwyd, LL21 9AB, United Kingdom
Planning authority
Conwy
Planning application
0/42466
First operating
2017
Turbines
1, 100 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 0/42466, with what the planning evidence pack adds for this site.

Every application in Conwy · Alerts for applications and incidents near here

  • 12 February 2016 Planning application submitted
  • 20 April 2016 Planning permission granted
  • 21 June 2017 Construction started
  • 1 November 2017 Operational

None found. The register holds no published incident that names Bodtegir. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Bodtegir had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bodtegir; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Bodtegir?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 January 2018.
Where is Bodtegir?
16 km south-west of Ruthin, Clwyd, United Kingdom (postcode LL21 9AB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).