← Back to Gwent

Battery storage · United Kingdom

Abertillery - Wind farm - Battery

Operator RWE Renewables UK Limited · Owner Rwe AG

Application RefusedData checked 16 November 2026Source record dated 2 October 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Abertillery - Wind farm - Battery is a battery storage site on the edge of Magor, Gwent, United Kingdom. Its planning application (DNS/3278009) went to Welsh Government (NSIP) on 11 October 2024 and was refused on 6 March 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 36 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 22 other sites and 531 energy sites within 40 km for Abertillery - Wind farm - Battery

Members see the sites and incidents around this one, and every record behind them.

RWE RENEWABLES UK LIMITED (03758404), active, since 1999. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
RWE Renewables UK Limited
Owner
Rwe AG
Location
Btw Abertillery And Abersychan, Pontypool, Gwent, NP26 3TS, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3278009

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3278009, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

Status changed from Application Submitted to Application Refused on 16 November 2026.

  • 11 October 2024 Planning application submitted
  • 6 March 2026 Planning permission refused

None found. The register holds no published incident that names Abertillery - Wind farm - Battery. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Abertillery - Wind farm - Battery had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Abertillery - Wind farm - Battery; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Abertillery - Wind farm - Battery?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Abertillery - Wind farm - Battery?
On the edge of Magor, Gwent, United Kingdom (postcode NP26 3TS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).