Offshore wind · United Kingdom

Rampion Wind Farm (Extension), (Rampion 2)

Operator RWE Renewables UK Limited · Owner Rwe AG

Awaiting Construction1,200 MWData checked 16 November 2026Source record dated 6 May 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rampion Wind Farm (Extension), (Rampion 2) is a 1,200 MW offshore wind farm 21 km south-west of Rottingdean, United Kingdom. Its planning application (EN010117) went to The Planning Inspectorate - National Infrastructure on 10 August 2023 and was granted on 4 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

RWE RENEWABLES UK LIMITED (03758404), active, since 1999. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rampion Wind Farm (Extension), (Rampion 2) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0447, Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023, 255 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04472023Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023255 kmMajor
EIR-00292024Second blade failure of 2024 at Dogger Bank A offshore wind farm484 kmSignificant
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm484 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
1,200 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
RWE Renewables UK Limited
Owner
Rwe AG
Location
Rampion Wind Farm, East Quay, Newhaven, Offshore, BN9, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010117
Turbines
90, 325 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010117, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 10 August 2023 Planning application submitted
  • 4 April 2025 Planning permission granted
  • 4 April 2032 Planning permission runs out

None found. The register holds no published incident that names Rampion Wind Farm (Extension), (Rampion 2). If you know of one, report it (confidential reports are anonymised).

Has Rampion Wind Farm (Extension), (Rampion 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rampion Wind Farm (Extension), (Rampion 2); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Rampion Wind Farm (Extension), (Rampion 2)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2025.
Where is Rampion Wind Farm (Extension), (Rampion 2)?
21 km south-west of Rottingdean, United Kingdom (postcode BN9).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).