← Back to Gwent

Solar · United Kingdom

Craig y Perthi Solar Farm

Operator JBM Solar Projects Limited · Owner Pp Asset Management Limited

Application Refused99.9 MWData checked 16 November 2026Source record dated 19 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Craig y Perthi Solar Farm is a 99.9 MW solar farm 3.8 km west of Magor, Gwent, United Kingdom. Its planning application (DNS/3279787) went to Welsh Government (NSIP) on 11 April 2024 and was refused on 21 October 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 42 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 18 other sites and 536 energy sites within 40 km for Craig y Perthi Solar Farm

Members see the sites and incidents around this one, and every record behind them.

JBM SOLAR PROJECTS LTD (10064549), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
99.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
JBM Solar Projects Limited
Owner
Pp Asset Management Limited
Location
Btw M4 and the Railway, Near Llanwern, Underwood & Bishston, Newport, Gwent, NP18 2EA, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3279787

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3279787, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 11 April 2024 Planning application submitted
  • 21 October 2025 Planning permission refused

None found. The register holds no published incident that names Craig y Perthi Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Craig y Perthi Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Craig y Perthi Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Craig y Perthi Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 19 January 2026.
Where is Craig y Perthi Solar Farm?
3.8 km west of Magor, Gwent, United Kingdom (postcode NP18 2EA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).