Craig y Perthi Solar Farm

Operator JBM Solar Projects Limited · Owner Pp Asset Management Limited

AbandonedData checked 16 November 2026Source record dated 1 October 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Craig y Perthi Solar Farm is a battery storage site 3.8 km west of Magor, Gwent, United Kingdom. Its planning application (DNS/3279787) went to Welsh Government (NSIP) on 11 April 2024 and was refused on 21 October 2025. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 42 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 18 other sites and 536 energy sites within 40 km for Craig y Perthi Solar Farm

Members see the sites and incidents around this one, and every record behind them.

JBM SOLAR PROJECTS LTD (10064549), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Status
Abandoned
Operator or applicant
JBM Solar Projects Limited
Owner
Pp Asset Management Limited
Location
Btw M4 and the Railway, Near Llanwern, Underwood & Bishston, Newport, Gwent, NP18 2EA, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3279787

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3279787, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

Status changed from Application Refused to Abandoned on 16 November 2026.

  • 11 April 2024 Planning application submitted
  • 21 October 2025 Planning permission refused

None found. The register holds no published incident that names Craig y Perthi Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Craig y Perthi Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Craig y Perthi Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Craig y Perthi Solar Farm?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Craig y Perthi Solar Farm?
3.8 km west of Magor, Gwent, United Kingdom (postcode NP18 2EA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).