Langstone Court Road Solar Farm

Operator Private Developer

Operational2.5 MWData checked 16 November 2026Source record dated 14 June 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Langstone Court Road Solar Farm is a 2.5 MW solar farm 3 km east of Caerleon, Gwent, United Kingdom. Its planning application (11/0311) went to Newport on 25 March 2011 and was granted on 9 November 2011. It has been operating since 11 January 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 48 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 409 other sites and 536 energy sites within 40 km for Langstone Court Road Solar Farm

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
2.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Private Developer
Location
Langstone Court Road, Langstone, Newport, Gwent, Gwent, United Kingdom
Planning authority
Newport
Planning application
11/0311
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 11/0311, with what the planning evidence pack adds for this site.

Every application in Newport · Alerts for applications and incidents near here

  • 25 March 2011 Planning application submitted
  • 9 November 2011 Planning permission granted
  • 11 January 2013 Operational

None found. The register holds no published incident that names Langstone Court Road Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Langstone Court Road Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Langstone Court Road Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Langstone Court Road Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 June 2013.
Where is Langstone Court Road Solar Farm?
3 km east of Caerleon, Gwent, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).