Onshore wind · United Kingdom
Cotton Farm
Operator Greencoat UK Wind
Operational20 MWData checked 16 November 2026Source record dated 5 January 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cotton Farm is a 20 MW wind farm 6.6 km south of Godmanchester, Cambridgeshire, United Kingdom. Its planning application (0802296FUL) went to Huntingdonshire on 4 August 2008 and was granted on appeal on 14 December 2010. It has been operating since 31 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Cotton Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
GREENCOAT UK WIND PLC (08318092), active, since 2012. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 20 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Greencoat UK Wind
- Location
- Land between Graveley, Offord Darcy and Great Paxton, Cambridgeshire, United Kingdom
- Planning authority
- Huntingdonshire
- Planning application
- 0802296FUL
- Appeal reference
- 0900067REFUSL
- First operating
- 2013
- Turbines
- 8
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 0802296FUL, with what the planning evidence pack adds for this site.
Every application in Huntingdonshire · Alerts for applications and incidents near here
Timeline
- 4 August 2008 Planning application submitted
- 17 November 2009 Planning permission refused
- 14 December 2010 Planning permission granted
- 14 December 2010 Appeal granted
- 1 May 2012 Construction started
- 31 March 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Cotton Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Cotton Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cotton Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Cotton Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 January 2015.
- Where is Cotton Farm?
- 6.6 km south of Godmanchester, Cambridgeshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).