Onshore wind · United Kingdom
Common Barn Wind Farm
Operator TCI Renewables
Operational6.2 MWData checked 16 November 2026Source record dated 11 December 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Common Barn Wind Farm is a 6.2 MW wind farm 6.7 km north of Eaton Socon, Cambridgeshire, United Kingdom. Its planning application (1200803FUL) went to Huntingdonshire on 15 May 2012 and was granted on appeal on 11 July 2013. It has been operating since 9 May 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Common Barn Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
TCI RENEWABLES LIMITED (05360262), active, since 2005. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 6.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- TCI Renewables
- Location
- Church Farm, Southoe, Huntingdonshire, Cambridgeshire, United Kingdom
- Planning authority
- Huntingdonshire
- Planning application
- 1200803FUL
- Appeal reference
- 1200061NONDET
- First operating
- 2019
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 1200803FUL, with what the planning evidence pack adds for this site.
Every application in Huntingdonshire · Alerts for applications and incidents near here
Timeline
- 15 May 2012 Planning application submitted
- 5 December 2012 Planning permission refused
- 11 July 2013 Planning permission granted
- 11 July 2013 Appeal granted
- 15 January 2018 Construction started
- 9 May 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Common Barn Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Common Barn Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Common Barn Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Common Barn Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 December 2019.
- Where is Common Barn Wind Farm?
- 6.7 km north of Eaton Socon, Cambridgeshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).