Planning pack for this site, £295Other options

Solar · United Kingdom

East Park Energy

Operator Brockwell Energy

Application Submitted400 MWData checked 16 November 2026Source record dated 1 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

East Park Energy is a 400 MW solar farm 3.2 km north of Eaton Socon, Cambridgeshire, United Kingdom. Its planning application (EN010141) went to The Planning Inspectorate - National Infrastructure on 30 October 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 22 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

BROCKWELL ENERGY LIMITED (SC560225), active, since 2017. 4 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for East Park Energy sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof14 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough28 kmSignificant
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium30 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
400 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Brockwell Energy
Location
E/O Little Staughton, Btw S/O Great Staughton, Kimbolton Road, Hail Weston, St Neots, Cambridgeshire, PE19 5JW, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010141

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010141, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 30 October 2025 Planning application submitted

None found. The register holds no published incident that names East Park Energy. If you know of one, report it (confidential reports are anonymised).

Has East Park Energy had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names East Park Energy; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of East Park Energy?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 1 May 2026.
Where is East Park Energy?
3.2 km north of Eaton Socon, Cambridgeshire, United Kingdom (postcode PE19 5JW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).