Energy sites / United Kingdom / Cambridgeshire

Solar · United Kingdom

Staughton Airfield Solar Farm

Operational40 MWChecked 6 October 2026Last changed in the dataset 16 January 2026

Technology
Solar
Capacity
40 MW
Status
Operational
Operator or applicant
GreenHedge (BayWa r.e.) / Next Energy Capital
Location
Land At Top Farm and Little Stau, Airfield Industrial Estate, Little Staughton, Bedford, Bedfordshire, Cambridgeshire, MK44 2BN, United Kingdom
Planning authority
Huntingdonshire
Planning application
15/00940/FUL
First operating
2020

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 18 June 2015 Planning application submitted
  • 28 September 2015 Planning permission granted
  • 1 March 2019 Construction started
  • 1 March 2020 Operational

None found. The register holds no published incident that names Staughton Airfield Solar Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.