Planning application · Onshore wind · Huntingdonshire

Common Barn Wind Farm

Operational6.2 MWApplication 1200803FULSubmitted 15 May 2012Granted on appeal 11 July 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
1200803FUL
Planning authority
Huntingdonshire
County or area
Cambridgeshire
Nation
England
Technology
Onshore wind
Capacity
6.2 MW
Status
Operational
Operator or applicant
TCI Renewables
Location
Church Farm, Southoe, Huntingdonshire
Appeal reference
1200061NONDET
Turbines
3
First operating
2019
  • 15 May 2012 Planning application submitted
  • 5 December 2012 Planning permission refused
  • 11 July 2013 Planning permission granted
  • 11 July 2013 Appeal granted
  • 15 January 2018 Construction started
  • 9 May 2019 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1578, Wind turbine fire near Chumleigh in Devon, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15782024Wind turbine fire near Chumleigh in Devon18 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm20 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms34 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Common Barn Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Huntingdonshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.