Solar · United Kingdom

Cotgrave solar farm

Operator Anesco · Owner Quanesco Midco Limited

Operational4.9 MWData checked 16 November 2026Source record dated 15 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cotgrave solar farm is a 4.9 MW solar farm in Cotgrave, Nottinghamshire, United Kingdom. Its planning application (14/01221/FUL) went to Rushcliffe on 23 June 2014 and was granted on 28 January 2015. It has been operating since 15 July 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 65 other energy sites within 10 km, 46 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 63 other sites and 592 energy sites within 40 km for Cotgrave solar farm

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Blackberry Farm Main Road Cotgrave Nottinghamshire, Nottinghamshire, United Kingdom
Planning authority
Rushcliffe
Planning application
14/01221/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01221/FUL, with what the planning evidence pack adds for this site.

Every application in Rushcliffe · Alerts for applications and incidents near here

  • 23 June 2014 Planning application submitted
  • 28 January 2015 Planning permission granted
  • 15 May 2015 Construction started
  • 15 July 2015 Operational

None found. The register holds no published incident that names Cotgrave solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cotgrave solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cotgrave solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cotgrave solar farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 March 2016.
Where is Cotgrave solar farm?
In Cotgrave, Nottinghamshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).