Solar · United Kingdom

Stragglethorpe Road farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational5 MWData checked 16 November 2026Source record dated 18 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stragglethorpe Road farm is a 5 MW solar farm on the edge of Cotgrave, Nottinghamshire, United Kingdom. Its planning application (15/01776/FUL) went to Rushcliffe on 9 January 2015 and was granted on 1 December 2015. It has been operating since 29 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 64 other energy sites within 10 km, 45 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 592 energy sites within 40 km for Stragglethorpe Road farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land Opposite Entrance To, Main Road, Cotgrave Place Golf Clu, Nottingham, Nottinghamshire, NG12 2JZ, United Kingdom
Planning authority
Rushcliffe
Planning application
15/01776/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01776/FUL, with what the planning evidence pack adds for this site.

Every application in Rushcliffe · Alerts for applications and incidents near here

  • 9 January 2015 Planning application submitted
  • 1 December 2015 Planning permission granted
  • 5 February 2016 Construction started
  • 29 March 2016 Operational

None found. The register holds no published incident that names Stragglethorpe Road farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stragglethorpe Road farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stragglethorpe Road farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stragglethorpe Road farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 August 2016.
Where is Stragglethorpe Road farm?
On the edge of Cotgrave, Nottinghamshire, United Kingdom (postcode NG12 2JZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).