Planning pack for this site, £295Other options

Battery storage · United Kingdom

CMU_HERB-1

Awaiting Construction7.4 MWChecked 5 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

CMU_HERB-1 is a 7.4 MW battery storage site on the edge of Radcliffe on Trent, United Kingdom. Its status in the public dataset is awaiting Construction. There are 53 other energy sites within 10 km, 9 of them battery storage sites. The register holds no incident at this site. It holds 14 incidents at battery storage sites in the United Kingdom, and 193 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for CMU_HERB-1 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells22 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool136 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire148 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
7.4 MW
Status
Awaiting Construction (Capacity Market unit, delivery year 2029)
Operator
RWE RENEWABLES UK SOLAR AND STORAGE LIMITED
Location
NG12 3TQ, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names CMU_HERB-1. If you know of one, report it (confidential reports are anonymised).

Has CMU_HERB-1 had a fire or other incident?
None is on the register as of 7 November 2026. The register holds no published incident that names CMU_HERB-1; it holds 14 incidents at battery storage sites in the United Kingdom.
What is the status of CMU_HERB-1?
Awaiting Construction, in the public dataset.
Where is CMU_HERB-1?
On the edge of Radcliffe on Trent, United Kingdom (postcode NG12 3TQ).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).