Battery storage · United Kingdom

CMU_CLAB-1

Operational9.3 MWChecked 5 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

CMU_CLAB-1 is a 9.3 MW battery storage site 4 km north-west of Bishops Cleeve, United Kingdom. Its status in the public dataset is operational. There are 26 other energy sites within 10 km, 6 of them battery storage sites. The register holds no incident at this site. It holds 14 incidents at battery storage sites in the United Kingdom, and 193 worldwide.

The operator's 6 other sites and 321 energy sites within 40 km for CMU_CLAB-1

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Battery)
Capacity
9.3 MW
Status
Operational (Capacity Market unit, delivery year 2025, agreement awarded)
Operator
RWE RENEWABLES UK SOLAR AND STORAGE LIMITED
Location
GL20 7BS, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names CMU_CLAB-1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has CMU_CLAB-1 had a fire or other incident?
None is on the register as of 7 November 2026. The register holds no published incident that names CMU_CLAB-1; it holds 14 incidents at battery storage sites in the United Kingdom.
What is the status of CMU_CLAB-1?
Operational, in the public dataset.
Where is CMU_CLAB-1?
4 km north-west of Bishops Cleeve, United Kingdom (postcode GL20 7BS).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).