Solar · United Kingdom

Heron Solar Farm & Battery Storage

Operator JBM Solar Projects 38 Limited

Awaiting Construction20 MWData checked 16 November 2026Source record dated 11 September 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Heron Solar Farm & Battery Storage is a 20 MW solar farm on the edge of Cotgrave, Nottinghamshire, United Kingdom. Its planning application (23/02250/FUL) went to Rushcliffe on 6 December 2023 and was granted on 27 August 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 44 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Heron Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells23 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool137 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire148 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
JBM Solar Projects 38 Limited
Location
North Of Staragglethorpe Road Stragglethorpe, Nottinghamshire, NG12 2JX, United Kingdom
Planning authority
Rushcliffe
Planning application
23/02250/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/02250/FUL, with what the planning evidence pack adds for this site.

Every application in Rushcliffe · Alerts for applications and incidents near here

  • 6 December 2023 Planning application submitted
  • 27 August 2024 Planning permission granted
  • 27 August 2027 Planning permission runs out

None found. The register holds no published incident that names Heron Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Heron Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Heron Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Heron Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 September 2024.
Where is Heron Solar Farm & Battery Storage?
On the edge of Cotgrave, Nottinghamshire, United Kingdom (postcode NG12 2JX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).