Onshore wind · United Kingdom

Ardlebank Farm Wind Cluster

Operator Green Cat Renewables · Owner Green Cat Holdco Limited

Application Refused2.4 MWData checked 16 November 2026Source record dated 3 July 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ardlebank Farm Wind Cluster is a 2.4 MW wind farm 12 km north-west of Blairgowrie and Rattray, Tayside, United Kingdom. Its planning application (11/01485/FLL) went to Perth and Kinross on 5 September 2011 and was refused on 4 June 2013. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 34 other sites and 148 energy sites within 40 km for Ardlebank Farm Wind Cluster

Members see the sites and incidents around this one, and every record behind them.

GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
2.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Green Cat Renewables
Owner
Green Cat Holdco Limited
Location
Ballintuim, Blairgowrie, Tayside, PH10 7NQ, United Kingdom
Planning authority
Perth and Kinross
Planning application
11/01485/FLL
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 11/01485/FLL, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 5 September 2011 Planning application submitted
  • 4 June 2013 Planning permission refused

None found. The register holds no published incident that names Ardlebank Farm Wind Cluster. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ardlebank Farm Wind Cluster had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ardlebank Farm Wind Cluster; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ardlebank Farm Wind Cluster?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 3 July 2013.
Where is Ardlebank Farm Wind Cluster?
12 km north-west of Blairgowrie and Rattray, Tayside, United Kingdom (postcode PH10 7NQ).