← Back to Tayside

Onshore wind · United Kingdom

Green Burn Wind Farm

Operator ABO Wind

Abandoned33 MWData checked 16 November 2026Source record dated 7 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Green Burn Wind Farm is a 33 MW wind farm 11 km north of Blairgowrie and Rattray, Tayside, United Kingdom. Its planning application (15/01691/FLM) went to Perth and Kinross on 7 October 2015 and was granted on appeal on 20 February 2018. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 8 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 5 other sites and 154 energy sites within 40 km for Green Burn Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
33 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
ABO Wind
Location
land at Blackhall Farm and Shieldrum Farm, approximately 11km north-west of Alyth and 5km north-east of Bridge of Cally in Perth and Kinross, Tayside, United Kingdom
Planning authority
Perth and Kinross
Planning application
15/01691/FLM
Appeal reference
PPA-340-2109
Turbines
11, 115 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01691/FLM, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 7 October 2015 Planning application submitted
  • 15 March 2017 Planning permission refused
  • 13 June 2017 Appeal lodged
  • 20 February 2018 Planning permission granted
  • 20 February 2018 Appeal granted
  • 20 February 2023 Planning permission expired

None found. The register holds no published incident that names Green Burn Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Green Burn Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Green Burn Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Green Burn Wind Farm?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 7 December 2021.
Where is Green Burn Wind Farm?
11 km north of Blairgowrie and Rattray, Tayside, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).