← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Doncaster

Thorne Farm

Operational5 MWApplication 14/01554/FULMSubmitted 12 September 2014Granted 16 April 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
14/01554/FULM
Planning authority
Doncaster
County or area
South Yorkshire
Nation
England
Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
Conergy
Location
Former Thorne Colliery, Grange Road, Moorends, Doncaster, DN8 4NA
First operating
2015
  • 12 September 2014 Planning application submitted
  • 16 April 2015 Planning permission granted
  • 1 June 2015 Construction started
  • 18 December 2015 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster18 kmSignificant
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton57 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine84 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DN8 4NA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Doncaster.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.