← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Central Bedfordshire

Double Arches Quarry Wind Turbine

Operational1.5 MWApplication CB/10/03034/FULLSubmitted 8 September 2010Granted 2 August 2011

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
CB/10/03034/FULL
Planning authority
Central Bedfordshire
County or area
Bedfordshire
Nation
England
Technology
Onshore wind
Capacity
1.5 MW
Status
Operational
Operator or applicant
Arnold White Estates (AWE Renewables)
Location
Double Arches Quarry Eastern Way Heath And Reach Leighton Buzzard LU7 9LF, LU7 9LF
Turbines
1
First operating
2014
  • 8 September 2010 Planning application submitted
  • 2 August 2011 Planning permission granted
  • 1 December 2014 Construction started
  • 18 December 2014 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1578, Wind turbine fire near Chumleigh in Devon, 60 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15782024Wind turbine fire near Chumleigh in Devon60 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm62 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms77 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near LU7 9LF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Central Bedfordshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.