Onshore wind · United Kingdom
Double Arches Quarry Wind Turbine
Operator Arnold White Estates (AWE Renewables)
Operational1.5 MWData checked 16 November 2026Source record dated 2 February 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Double Arches Quarry Wind Turbine is a 1.5 MW wind farm 4.2 km north-east of Leighton Buzzard, Bedfordshire, United Kingdom. Its planning application (CB/10/03034/FULL) went to Central Bedfordshire on 8 September 2010 and was granted on 2 August 2011. It has been operating since 18 December 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 84 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Double Arches Quarry Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Arnold White Estates (AWE Renewables)
- Location
- Double Arches Quarry Eastern Way Heath And Reach Leighton Buzzard LU7 9LF, Bedfordshire, LU7 9LF, United Kingdom
- Planning authority
- Central Bedfordshire
- Planning application
- CB/10/03034/FULL
- First operating
- 2014
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CB/10/03034/FULL, with what the planning evidence pack adds for this site.
Every application in Central Bedfordshire · Alerts for applications and incidents near here
Timeline
- 8 September 2010 Planning application submitted
- 2 August 2011 Planning permission granted
- 1 December 2014 Construction started
- 18 December 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Double Arches Quarry Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Double Arches Quarry Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Double Arches Quarry Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Double Arches Quarry Wind Turbine?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2017.
- Where is Double Arches Quarry Wind Turbine?
- 4.2 km north-east of Leighton Buzzard, Bedfordshire, United Kingdom (postcode LU7 9LF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).