← Back to Bedfordshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Leighton Linslade Water Recycling Centre - PV Array

Operator Anglian Water Services Limited

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 2 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Leighton Linslade Water Recycling Centre - PV Array is a 0.5 MW solar farm in Leighton Buzzard, Bedfordshire, United Kingdom. Its planning application (CB/23/03596/LDCP) went to Central Bedfordshire on 8 November 2023 and was granted on 21 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 60 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Leighton Linslade Water Recycling Centre - PV Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof30 kmMinor
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End38 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough42 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Anglian Water Services Limited
Location
Leighton Linslade Water Recycling Centre, Off Globe Lane, Leighton Buzzard, Bedfordshire, LU7 2TG, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/23/03596/LDCP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/23/03596/LDCP, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 8 November 2023 Planning application submitted
  • 21 December 2023 Planning permission granted

None found. The register holds no published incident that names Leighton Linslade Water Recycling Centre - PV Array. If you know of one, report it (confidential reports are anonymised).

Has Leighton Linslade Water Recycling Centre - PV Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Leighton Linslade Water Recycling Centre - PV Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Leighton Linslade Water Recycling Centre - PV Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 January 2024.
Where is Leighton Linslade Water Recycling Centre - PV Array?
In Leighton Buzzard, Bedfordshire, United Kingdom (postcode LU7 2TG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).