← Back to Bedfordshire

Battery storage · United Kingdom

Smarter Network Storage

Operator UK Power Networks

Decommissioned6 MWData checked 16 November 2026Source record dated 23 October 2018

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Smarter Network Storage is a 6 MW battery storage site in Leighton Buzzard, Bedfordshire, United Kingdom. Its planning application went to Central Bedfordshire. It has been operating since 12 December 2014. Its status in the Renewable Energy Planning Database (UK government) is decommissioned. There are 48 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 3 other sites and 637 energy sites within 40 km for Smarter Network Storage

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Decommissioned
Operator or applicant
UK Power Networks
Location
Leighton Buzzard, Bedfordshire, Bedfordshire, LU7 3NU, United Kingdom
Planning authority
Central Bedfordshire
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 15 May 2014 Construction started
  • 12 December 2014 Operational

None found. The register holds no published incident that names Smarter Network Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Smarter Network Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Smarter Network Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Smarter Network Storage?
Decommissioned, in the Renewable Energy Planning Database (UK government), where it last changed on 23 October 2018.
Where is Smarter Network Storage?
In Leighton Buzzard, Bedfordshire, United Kingdom (postcode LU7 3NU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).