Battery storage · United Kingdom
Smarter Network Storage
Operator UK Power Networks
Decommissioned6 MWData checked 16 November 2026Source record dated 23 October 2018
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Smarter Network Storage is a 6 MW battery storage site in Leighton Buzzard, Bedfordshire, United Kingdom. Its planning application went to Central Bedfordshire. It has been operating since 12 December 2014. Its status in the Renewable Energy Planning Database (UK government) is decommissioned. There are 48 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Smarter Network Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Decommissioned
- Operator or applicant
- UK Power Networks
- Location
- Leighton Buzzard, Bedfordshire, Bedfordshire, LU7 3NU, United Kingdom
- Planning authority
- Central Bedfordshire
- First operating
- 2014
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Central Bedfordshire · Alerts for applications and incidents near here
Timeline
- 15 May 2014 Construction started
- 12 December 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Smarter Network Storage. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Smarter Network Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Smarter Network Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Smarter Network Storage?
- Decommissioned, in the Renewable Energy Planning Database (UK government), where it last changed on 23 October 2018.
- Where is Smarter Network Storage?
- In Leighton Buzzard, Bedfordshire, United Kingdom (postcode LU7 3NU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).