← Back to Bedfordshire
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System

Operator Arnold White Estates Limited · Owner Arnold White Group Limited

Awaiting Construction1.5 MWData checked 16 November 2026Source record dated 26 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System is a 1.5 MW wind farm 3.1 km south-east of Leighton Buzzard, Bedfordshire, United Kingdom. Its planning application (CB/23/03278/FULL) went to Central Bedfordshire on 23 November 2023 and was granted on 8 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 52 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

ARNOLD WHITE ESTATES LIMITED (00322585), active, since 1937. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 86 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction86 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire91 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells140 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Arnold White Estates Limited
Owner
Arnold White Group Limited
Location
Astral Green, S/O Leighton Road And N/O The A505, Stanbridge, Leighton Buzzard, Bedfordshire, LU7 9BL, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/23/03278/FULL
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/23/03278/FULL, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 23 November 2023 Planning application submitted
  • 8 April 2024 Planning permission granted

None found. The register holds no published incident that names Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 April 2024.
Where is Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System?
3.1 km south-east of Leighton Buzzard, Bedfordshire, United Kingdom (postcode LU7 9BL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).