Solar · United Kingdom

Bury Farm - Solar Farm

Operator Interguide Group Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 26 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bury Farm - Solar Farm is a 49.9 MW solar farm 4.3 km south of Leighton Buzzard, Buckinghamshire, United Kingdom. Its planning application (21/02775/APP) went to Buckinghamshire on 30 June 2021 and was granted on 1 July 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bury Farm - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End33 kmMinor
EIR-14932026Solar panels catch fire on Bedford warehouse roof34 kmMinor
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford43 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Interguide Group Limited
Location
R/O Bury Farm, Mill Road, Slapton, Leighton Buzzard, Buckinghamshire, LU7 9BT, United Kingdom
Planning authority
Buckinghamshire
Planning application
21/02775/APP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/02775/APP, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 30 June 2021 Planning application submitted
  • 1 July 2022 Planning permission granted
  • 1 July 2025 Planning permission expired

None found. The register holds no published incident that names Bury Farm - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Bury Farm - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bury Farm - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bury Farm - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2022.
Where is Bury Farm - Solar Farm?
4.3 km south of Leighton Buzzard, Buckinghamshire, United Kingdom (postcode LU7 9BT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).