Battery storage · United Kingdom

Reach Road

Operator UK Power Networks · Owner Weirs Drove Development Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 30 June 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Reach Road is a 49.9 MW battery storage site in Burwell, Cambridgeshire, United Kingdom. Its planning application (20/00655/SON) went to East Cambridgeshire on 20 May 2020 and was granted on 15 July 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Reach Road sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 88 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction88 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells135 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire166 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
UK Power Networks
Owner
Weirs Drove Development Limited
Location
Armtrac, 70 Reach Road, Burwell, Cambridge, Cambridgeshire, Cambridgeshire, CB25 0AH, United Kingdom
Planning authority
East Cambridgeshire
Planning application
20/00655/SON

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/00655/SON, with what the planning evidence pack adds for this site.

Every application in East Cambridgeshire · Alerts for applications and incidents near here

  • 20 May 2020 Planning application submitted
  • 15 July 2020 Planning permission granted

None found. The register holds no published incident that names Reach Road. If you know of one, report it (confidential reports are anonymised).

Has Reach Road had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Reach Road; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Reach Road?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2020.
Where is Reach Road?
In Burwell, Cambridgeshire, United Kingdom (postcode CB25 0AH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).