Planning pack for this site, £295Other options

Battery storage · United Kingdom

GR - Hightown Drove

Awaiting Construction90 MWChecked 5 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

GR - Hightown Drove is a 90 MW battery storage site in Burwell, United Kingdom. Its status in the public dataset is awaiting Construction. There are 31 other energy sites within 10 km, 10 of them battery storage sites. The register holds no incident at this site. It holds 14 incidents at battery storage sites in the United Kingdom, and 193 worldwide.

GRENERGY RENEWABLES UK LIMITED (12875804), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for GR - Hightown Drove sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 89 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction89 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells134 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire166 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
90 MW
Status
Awaiting Construction (Capacity Market unit, delivery year 2029)
Operator
GRENERGY RENEWABLES UK LIMITED
Location
CB25 0FU, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names GR - Hightown Drove. If you know of one, report it (confidential reports are anonymised).

Has GR - Hightown Drove had a fire or other incident?
None is on the register as of 7 November 2026. The register holds no published incident that names GR - Hightown Drove; it holds 14 incidents at battery storage sites in the United Kingdom.
What is the status of GR - Hightown Drove?
Awaiting Construction, in the public dataset.
Where is GR - Hightown Drove?
In Burwell, United Kingdom (postcode CB25 0FU).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).