← Back to Cambridgeshire

Energy sites / United Kingdom / Cambridgeshire

Battery storage · United Kingdom

Land Southwest of Hightown Drove, Burwell - Battery Energy Storage System

Application Refused90 MWChecked 6 October 2026Last changed in the dataset 1 May 2026

Technology
Battery storage (Stand-alone Storage)
Capacity
90 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Grenergy Renewables UK Limited
Location
Sw/O Hightown Drove, Burwell, Cambridge, Cambridgeshire, CB25 0HD, United Kingdom
Planning authority
East Cambridgeshire
Planning application
25/00639/FUM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 10 July 2025 Planning application submitted
  • 9 March 2026 Planning permission refused

None found. The register holds no published incident that names Land Southwest of Hightown Drove, Burwell - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.