Weirs Drove, Burwell - Battery Storage Facility is a 30 MW battery storage site in Burwell, Cambridgeshire, United Kingdom. Its planning application (21/00816/FUL) went to East Cambridgeshire on 26 May 2021. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 34 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Weirs Drove, Burwell - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 88 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction88 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells135 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire166 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Fen Power 1 Limited
Location
Land North Of Electricity Sub-Station Weirs Drove Burwell, Cambridge, Cambridgeshire, CB25 0BP, United Kingdom
Planning authority
East Cambridgeshire
Planning application
21/00816/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/00816/FUL, with what the planning evidence pack adds for this site.

Every application in East Cambridgeshire · Alerts for applications and incidents near here

  • 26 May 2021 Planning application submitted

None found. The register holds no published incident that names Weirs Drove, Burwell - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Weirs Drove, Burwell - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Weirs Drove, Burwell - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Weirs Drove, Burwell - Battery Storage Facility?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 6 July 2021.
Where is Weirs Drove, Burwell - Battery Storage Facility?
In Burwell, Cambridgeshire, United Kingdom (postcode CB25 0BP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).