Double Arches Solar Array is a 2.5 MW solar farm 4.2 km north-east of Leighton Buzzard, Bedfordshire, United Kingdom. Its planning application (CB/20/01505/FULL) went to Central Bedfordshire on 18 May 2020 and was granted on 27 November 2020. It has been operating since 1 January 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 84 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Double Arches Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 2.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Checkley Wood Energy
- Location
- Land At Double Arches Quarry, Watling Street, Heath And Reach, Leighton Buzzard, Bedfordshire, Bedfordshire, LU7 9LD, United Kingdom
- Planning authority
- Central Bedfordshire
- Planning application
- CB/20/01505/FULL
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CB/20/01505/FULL, with what the planning evidence pack adds for this site.
Every application in Central Bedfordshire · Alerts for applications and incidents near here
Timeline
- 18 May 2020 Planning application submitted
- 27 November 2020 Planning permission granted
- 1 January 2026 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Double Arches Solar Array. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Double Arches Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Double Arches Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Double Arches Solar Array?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2020.
- Where is Double Arches Solar Array?
- 4.2 km north-east of Leighton Buzzard, Bedfordshire, United Kingdom (postcode LU7 9LD).