Solar · United Kingdom

Double Arches Solar Array

Operator Checkley Wood Energy

Operational2.5 MWData checked 16 November 2026Source record dated 14 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Double Arches Solar Array is a 2.5 MW solar farm 4.2 km north-east of Leighton Buzzard, Bedfordshire, United Kingdom. Its planning application (CB/20/01505/FULL) went to Central Bedfordshire on 18 May 2020 and was granted on 27 November 2020. It has been operating since 1 January 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 84 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

643 energy sites within 40 km for Double Arches Solar Array

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Checkley Wood Energy
Location
Land At Double Arches Quarry, Watling Street, Heath And Reach, Leighton Buzzard, Bedfordshire, Bedfordshire, LU7 9LD, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/20/01505/FULL
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/20/01505/FULL, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 18 May 2020 Planning application submitted
  • 27 November 2020 Planning permission granted
  • 1 January 2026 Operational

None found. The register holds no published incident that names Double Arches Solar Array. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Double Arches Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Double Arches Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Double Arches Solar Array?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2020.
Where is Double Arches Solar Array?
4.2 km north-east of Leighton Buzzard, Bedfordshire, United Kingdom (postcode LU7 9LD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).