← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Winchester

Concorde Way, Segensworth - Solar Panels

Under Construction1 MWApplication 22/01583/PNSOLSubmitted 19 July 2022Granted 30 November 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/01583/PNSOL
Planning authority
Winchester
County or area
Hampshire
Nation
England
Technology
Solar
Capacity
1 MW
Status
Under Construction
Operator or applicant
Solar Advanced Systems T/A SAS Energy
Location
Turbomeca UK Concorde Way Segensworth Fareham, PO15 5RL
  • 19 July 2022 Planning application submitted
  • 30 November 2022 Planning permission granted
  • 16 March 2023 Construction started
  • 30 November 2024 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1529, Fire contained to solar panels on Gosport flats roof, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15292023Fire contained to solar panels on Gosport flats roof12 kmMinor
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats13 kmMinor
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says18 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PO15 5RL is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Winchester.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.