Solar · United Kingdom
Concorde Way, Segensworth - Solar Panels
Operator Solar Advanced Systems T/A SAS Energy
Under Construction1 MWData checked 16 November 2026Source record dated 29 July 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Concorde Way, Segensworth - Solar Panels is a 1 MW solar farm on the edge of Titchfield, Hampshire, United Kingdom. Its planning application (22/01583/PNSOL) went to Winchester on 19 July 2022 and was granted on 30 November 2022. Construction started on 16 March 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 67 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Concorde Way, Segensworth - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Concorde Way, Segensworth - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1529, Fire contained to solar panels on Gosport flats roof, 12 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1529 | 2023 | Fire contained to solar panels on Gosport flats roof | 12 km | Minor |
| EIR-1534 | 2022 | Storm Eunice loosens solar panels on Eastleigh flats | 13 km | Minor |
| EIR-2076 | 2020 | Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says | 18 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Solar Advanced Systems T/A SAS Energy
- Location
- Turbomeca UK Concorde Way Segensworth Fareham, Hampshire, PO15 5RL, United Kingdom
- Planning authority
- Winchester
- Planning application
- 22/01583/PNSOL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/01583/PNSOL, with what the planning evidence pack adds for this site.
Every application in Winchester · Alerts for applications and incidents near here
Timeline
- 19 July 2022 Planning application submitted
- 30 November 2022 Planning permission granted
- 16 March 2023 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Concorde Way, Segensworth - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Concorde Way, Segensworth - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Concorde Way, Segensworth - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Concorde Way, Segensworth - Solar Panels?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 July 2022.
- Where is Concorde Way, Segensworth - Solar Panels?
- On the edge of Titchfield, Hampshire, United Kingdom (postcode PO15 5RL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).