Planning application · Onshore wind · Dumfries and Galloway

Barlockhart Moor Wind Turbines

Awaiting Construction8.4 MWApplication 21/0025/S42Submitted 21 January 2021Granted 10 February 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
21/0025/S42
Planning authority
Dumfries and Galloway
County or area
Wigtownshire
Nation
Scotland
Technology
Onshore wind
Capacity
8.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Barlockhart Moor Wind Energy Limited
Location
Barlockhart Moor Glenluce, DG8 0JQ
Turbines
4, 115 m to tip
  • 21 January 2021 Planning application submitted
  • 10 February 2022 Planning permission granted
  • 10 February 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1134, Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire25 kmSignificant
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm72 kmSignificant
EIR-10252018Worker dies after becoming stranded at Afton wind farm77 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DG8 0JQ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Dumfries and Galloway.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.