Onshore wind · United Kingdom

BARLOCKHART MOOR - extension

Operator West Coast Energy

Planning Permission Expired8.2 MWData checked 16 November 2026Source record dated 11 March 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

BARLOCKHART MOOR - extension is a 8.2 MW wind farm 17 km east of Stranraer, Dumfries and Galloway, United Kingdom. Its planning application (13/P/1/0136) went to Dumfries and Galloway on 25 March 2013 and was granted on 15 September 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 8 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 18 other sites and 73 energy sites within 40 km for BARLOCKHART MOOR - extension

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
8.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
West Coast Energy
Location
BARLOCKHART MOOR, GLENLUCE, Dumfries and Galloway, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
13/P/1/0136
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/P/1/0136, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 25 March 2013 Planning application submitted
  • 15 September 2015 Planning permission granted
  • 21 May 2021 Planning permission expired

None found. The register holds no published incident that names BARLOCKHART MOOR - extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has BARLOCKHART MOOR - extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names BARLOCKHART MOOR - extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of BARLOCKHART MOOR - extension?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 11 March 2020.
Where is BARLOCKHART MOOR - extension?
17 km east of Stranraer, Dumfries and Galloway, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).