Onshore wind · United Kingdom
Garvilland Farm
Operator Green Cat Renewables Limited
Awaiting Construction18 MWData checked 16 November 2026Source record dated 12 May 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Garvilland Farm is a 18 MW wind farm 15 km east of Stranraer, Dumfries and Galloway, United Kingdom. Its planning application (21/0595/FUL) went to Dumfries and Galloway on 12 April 2021 and was granted on 27 January 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Garvilland Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Garvilland Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1134, Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire, 20 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1134 | 2017 | Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire | 20 km | Significant |
| EIR-0922 | 2011 | Vestas turbine nacelle fire at Ardrossan wind farm during storm | 67 km | Significant |
| EIR-1025 | 2018 | Worker dies after becoming stranded at Afton wind farm | 73 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 18 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Green Cat Renewables Limited
- Location
- Garvilland Farm, Glenluce, Newton Stewart, Dumfries and Galloway, Dumfries and Galloway, DG8 0PA, United Kingdom
- Planning authority
- Dumfries and Galloway
- Planning application
- 21/0595/FUL
- Turbines
- 5, 149.5 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/0595/FUL, with what the planning evidence pack adds for this site.
Every application in Dumfries and Galloway · Alerts for applications and incidents near here
Timeline
- 12 April 2021 Planning application submitted
- 27 January 2026 Planning permission granted
- 27 January 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Garvilland Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Garvilland Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Garvilland Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Garvilland Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2026.
- Where is Garvilland Farm?
- 15 km east of Stranraer, Dumfries and Galloway, United Kingdom (postcode DG8 0PA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).