Minister links boiler tube leak and coal delays to 3,000MW loss from Bangladesh grid

June 2026Published 25 Nov 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersLow confidence
out of service for about •• daysShown in the record →Full estimate

Around 3,000 megawatts of generation was lost from Bangladesh's national grid around 28 June 2026, according to the Power, Energy and Mineral Resources Minister, who told parliament that day. The minister attributed the loss to two separate causes. First, a power plant underwent an emergency forced shutdown after a leak was detected in one of its boiler tubes. Second, rough conditions in the Bay of Bengal made it impossible to unload coal at a coal-fired power plant, so one of its units remained shut.

The combined reduction led to load-shedding across various parts of the country, including Dhaka. The minister said he expected the situation to improve within two days, with load-shedding easing once generation returned to normal. The plants involved were not named in the report.

Rough weather in the Bay of Bengal prevented coal unloading at a coal-fired plant, keeping one of its units shut, according to the minister. The source does not state the cause of the boiler tube leak.

  1. Routine boiler tube inspection and leak monitoring can identify faults before they force emergency shutdowns.
  2. Coal-fired plants dependent on sea-borne fuel should plan alternative unloading options and hold buffer stocks for weather disruption.
  3. Operators and system planners should communicate load-shedding plans and expected recovery times early to customers and public bodies during supply shortfalls.

More lessons on detection and monitoring, weather and external hazards, outages, backup supply and restoration, from every incident on the register.

Published 2026-11-25. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Energy asset incidents by year, free with a credit (PNG).

Browse the full register or submit an incident.