Internal cable fault triggers substation fire alarm and CBD power outages in Auckland
Aug 2024Published 25 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in New Zealand, and an email when EIR-3035 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Vector
What happened
On the evening of Saturday 24 August 2024, an internal cable fault at the Hobson Street substation in Auckland triggered a smoke alarm, and sprinklers in a high voltage switch room were activated at about 5.09pm. Fire and Emergency New Zealand attended with six fire trucks, two ladder trucks and a specialist command vehicle at the peak of the response. Power went out in several areas of the central business district, centred on Nelson, Halsey, Wellesley and Custom streets, at around 5.15pm.
Vector said the alarm dispatched emergency services and its crews automatically. After Fire and Emergency cleared the site, Vector crews entered, isolated the fault and restored power. The fire was extinguished at around 6pm, and Vector crews remained on site while the alarm was reset. The disruption to supply also caused the 1News 6pm bulletin to go off air for about three seconds.
Contributing factors
Vector attributed the event to an internal cable fault. No further cause, equipment age or maintenance history has been reported.
Lessons learned
- Automatic alarm activation at substations dispatches emergency services, so operators should agree clear site-clearance and re-entry procedures with fire services in advance.
- Isolating faulted equipment quickly once the site is cleared limits the area affected by an outage, as occurred here.
- Cable terminations and connections in high voltage switch rooms are worth monitoring and inspecting, since internal cable faults can trigger fire protection systems.
More lessons on worker safety and safe systems of work, electrical protection and isolation, detection and monitoring, from every incident on the register.
Source
Other entries that name Auckland