Spain and Portugal blackout of April 2025 prompts Repsol legal claims
Apr 2025Published 18 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in Spain, and an email when EIR-2931 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Endesa, Iberdrola, Naturgy, Red Eléctrica
What happened
On 28 April 2025 a widespread power outage affected large parts of Spain and Portugal, with some areas reported without power for up to 16 hours. According to MLQ.ai, citing Reuters, Europa Press and El Confidencial, Repsol's industrial hubs at A Coruña, Bilbao, Cartagena, Tarragona and Puertollano were halted by the blackout. On 16 November 2026 a Repsol spokesperson said the company had filed legal claims against the distributors Iberdrola, Naturgy and Endesa, and against grid operator Red Eléctrica, a unit of Redeia.
El Confidencial reported the claims total about €120 million; Repsol declined to comment on the amount. Company sources told Europa Press that a separate claim was filed for each site against the distributor serving that area. The claims also reportedly include an incident at the Cartagena complex on 22 April 2025.
Contributing factors
A string of investigations reported by MLQ.ai pointed to a voltage surge as the cause of the outage. The Spanish energy and competition regulator CNMC opened formal probes in April 2025 into Red Eléctrica for suspected very serious infringements, and into Iberdrola, Naturgy, Endesa and Repsol for suspected serious infringements. The CNMC said the breaches may have affected power system operations but did not directly cause the blackout.
Lessons learned
- Industrial sites with continuous processes should have tested procedures for safe shutdown and restart during an extended loss of grid supply.
- Operators should keep dated records of formal notices and of site-level losses, as these may be needed for any later claim.
- Grid operators should review how voltage disturbances are contained so that they do not spread across the network.
More lessons on worker safety and safe systems of work, spacing, layout and fire spread, from every incident on the register.
Source
Published 2026-11-18. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.